Pre-Construction Survey - Plot 12

Report by Bob Williams on 7/2/2023

Report Summary

Initial land survey for Plot 12. Ground is stable, but evidence of potential water runoff issues on the western edge.

Ground Stability

Soil samples taken and analyzed. Ground composition is suitable for the planned foundation.

Water Runoff Analysis

Visible erosion channels on the western boundary suggest heavy water flow during rain. A drainage system is recommended before construction begins.

Erosion marks near western fence line.

Erosion marks near western fence line.

erosion
water damage
survey
land
construction